The scope was like to like replacement of Boat landing and Barge Bumpers. The EPC scope of work includes pre-engineering and pre-construction surveys,…
Details
Back
P393
Construction engineering, fabrication, painting, load out and sea fastening of Boat Landings and Riser Protectors at UMM SHAIF Field
The scope of works includes fabrication of boat landings of Alpha & Beta WHTs in UMM SHAIF Field of (5 Nos) with total weight of 130 Tons each.
In addition, to fabrication of riser Protectors for Umm SHAIF Super complex at Riser Platform of (2 Nos) with total weight of 120 Tons each.
All fabrication, Painting , load out & sea fastening works were completed at CCTC yard in ICAD-II
Also, Load out operation on Client supplied cargo barges was completed at CCTC jetty in ICAD-II utilizing heavy duty crawler cranes of 500 Tons capacity.