The scope was like to like replacement of Boat landing and Barge Bumpers. The EPC scope of work includes pre-engineering and pre-construction surveys,…
DetailsTDS 2000 Semisubmersible Drilling Rig - 140 Men Accommodation Module and Technical Buildings Architectural Outfitting and HVAC Works
The project is for 2 semi-submersible drilling rigs. Each rig has a 140-man accommodation module, in addition to technical buildings. All to ABS class certification.