The scope was like to like replacement of Boat landing and Barge Bumpers. The EPC scope of work includes pre-engineering and pre-construction surveys,…
DetailsTDS2500 "DELBA III" Semisubmersible Drilling Rig - 200 Men Accommodation Module and Technical Buildings Architectural Outfitting and HVAC Works
The project is for 1 semi-submersible drilling rig. It has a 200-man accommodation module, in addition to technical buildings. All to ABS class certification.