The scope was like to like replacement of Boat landing and Barge Bumpers. The EPC scope of work includes pre-engineering and pre-construction surveys,…
Details
Back
P348
FEED Endorsement, Engineering, Procurement, Construction, Fabrication, Pre-Commissioning & Commissioning of Local Control Building
Engineering, Procurement, Construction and Commissioning of the LCR module including the structural, architectural, HVAC, mechanical, firefighting, NOVEC 1230 system, Fire & Gas system, lighting and small power and installation of free issued Electrical equipment’s / panel. Also included load out of LCR Module from CCTC jetty to the transportation Barge.