EPC WORKS FOR BOAT LANDING REPLACEMENT AT UZ AND UAD PHASE-II


The scope was like to like replacement of Boat landing and Barge Bumpers.
 
The EPC scope of work includes pre-engineering and pre-construction surveys, construction engineering, material management, fabrication, painting, load out, and offshore installation.
 
CCTC has utilized its own marine spread, including supply vessels (JPW-36 and JPW-70) and Jack-up barges (JPW-215) to execute the offshore works.
 
CCTC successfully and safely executed 18 boat landings and ACPT-1 chain replacements without LTI.
 

Client / M.C: ADNOC

Year of Completion: Ongoing