This phase involved the installation of three ESPs, two at WHP-011 and one at WHP-01. The scope of works comprises procurement of Materials, Fabrication,…
Details
Back
P377
EPC WORKS FOR BOAT LANDING REPLACEMENT AT UZ AND UAD PHASE-II
The scope was like to like replacement of Boat landing and Barge Bumpers.
The EPC scope of work includes pre-engineering and pre-construction surveys, construction engineering, material management, fabrication, painting, load out, and offshore installation.
CCTC has utilized its own marine spread, including supply vessels (JPW-36 and JPW-70) and Jack-up barges (JPW-215) to execute the offshore works.
CCTC successfully and safely executed 18 boat landings and ACPT-1 chain replacements without LTI.