EPC Work of Umm Shaif Combined Site Scheme


Package-1: 11KV LOAD MIGRATION FROM PGP TO PDP
  • Migration of loads fed from 11kV, 26.3kA switchgear (4102-081) on USSC PGP to the 11kV, 50kA switchgear 495-SWGR-1103 on PDP and subsequently demolition of existing switchgear (4102-081).
  • Modification of existing Protection and Earthing System.
  • Modification of existing PMS and ECMS system.
 
Package-2: REPLACEMENT OF EDGs AT USAAP
  • Replacement the existing 1MVA 2 Nos. Emergency Generators (40G91A & B) at the offshore platform of Umm Shaif  (USAAP) facility.  
 

Client / M.C: ADNOC

Year of Completion: Ongoing