The scope was like to like replacement of Boat landing and Barge Bumpers. The EPC scope of work includes pre-engineering and pre-construction surveys,…
Details
Projects
P378
CONSTRUCTION FOR THE INSTALATION OF ELECTRICAL SUBMERSIBLE PUMPS (ESP) AT WHP-01 AND WHP-11
This phase involved the installation of three ESPs, two at WHP-011 and one at WHP-01. The scope of works comprises procurement of Materials, Fabrication,…
Details
P387
EPC Work of Umm Shaif Combined Site Scheme
Package-1: 11KV LOAD MIGRATION FROM PGP TO PDP Migration of loads fed from 11kV, 26.3kA switchgear (4102-081) on USSC PGP to the 11kV, 50kA switchgear…
Details
P391
TECHNICAL BUILDINGS WORKS FOR PROJECT 2300/2301 & 2302/2303 – ZULF AH EAST & WEST OIL FACILITIES
Design, verification, detailed engineering, procurement, fabrication, installation, pre-commissioning, commissioning, start-up, and operation of the Architectural,…
Details
P393
Construction engineering, fabrication, painting, load out and sea fastening of Boat Landings and Riser Protectors at UMM SHAIF Field
The scope of works includes fabrication of boat landings of Alpha & Beta WHTs in UMM SHAIF Field of (5 Nos) with total weight of 130 Tons each. In…
Details
P357
HVAC System on Technical Buildings Associated with ADMA-OPCO NASR Full Field Development Project Package 2
The scope of work includes the detail design, procurement and assistant commissioning of HVAC system and Related E&I for various platforms in NASR…
Details
P355
Subcontract for Technical Rooms on the WHT’s Associated with ADMA-OPCO NASR Full Field Development Project-Package 1
CCTC Scope of work includes engineering, procurement, fabrication, installation, testing, pre-commissioning, commissioning & start-up for the LER/ELECTRICAL…
Details
P352
EPC Works for Replacement Of Obsolete Caravans In Al Jimi
Basic design, detailed and construction engineering, procurement, construction and commissioning of the above said project in accordance with ADNOC Rules,…
Details
P350
Engineering, Procurement, Fabrication, Installation, Testing, Pre-Commissioning, Commissioning & Start-Up For The Technical Buildings And Living Quarters Module on ULAP For Umm Lulu Full Field Development Project Package-2
Engineering, Procurement, Fabrication, Installation, Testing, Pre-Commissioning, Commissioning & Start-Up for The Technical Buildings and Living Quarters…
Details