The scope was like to like replacement of Boat landing and Barge Bumpers. The EPC scope of work includes pre-engineering and pre-construction surveys,…
Details
Back
P378
CONSTRUCTION FOR THE INSTALATION OF ELECTRICAL SUBMERSIBLE PUMPS (ESP) AT WHP-01 AND WHP-11
This phase involved the installation of three ESPs, two at WHP-011 and one at WHP-01.
The scope of works comprises procurement of Materials, Fabrication, electrical & instrumentation works, pre-commissioning, testing, and commissioning.
CCTC has utilized its own marine spread, including supply vessels (JPW-36) and Jack-up barges (JPW-215) to execute the offshore works.
CCTC successfully and safely executed works at WHP-01 and WHP-11 without LTI.