The scope of CCTC includes carrying out of complete Engineering, Procurement, Fabrication, Logistics (manpower and materials transportation), Installation,…
Details
Back
P387
EPC Work of Umm Shaif Combined Site Scheme
Package-1: 11KV LOAD MIGRATION FROM PGP TO PDP
- Migration of loads fed from 11kV, 26.3kA switchgear (4102-081) on USSC PGP to the 11kV, 50kA switchgear 495-SWGR-1103 on PDP and subsequently demolition of existing switchgear (4102-081).
- Modification of existing Protection and Earthing System.
- Modification of existing PMS and ECMS system.
Package-2: REPLACEMENT OF EDGs AT USAAP
- Replacement the existing 1MVA 2 Nos. Emergency Generators (40G91A & B) at the offshore platform of Umm Shaif (USAAP) facility.